Evaluate the original goals and design principles

This entry is part 1 of 10 in the series Binsfeldius Cluster (HV2012)

The original goals and design principles as outlined here are still valid for the new build, a summary:

  1. Low power consumption (equal or less than my current single host)
  2. Be as small as possible
  3. Silent running
  4. Enable high availability for VM’s
  5. Based completely on Microsoft technology
  6. Must be easily scalable and feel “enterprisy” :)
  7. Low cost solution!

For moving to the new platform I’ve decided to do a full bare metal install, no in-place upgrade.

  • Reuse the existing hardware
  • Reusing the nodes boot LUNs (erase and reinitialize)
  • The existing VM’s are on a separate LUN and can be reused on the new platform.
  • The storage design will stay the same
  • Keep the domain controller on the cluster
  • The network design has changed to allow for more flexibility and security
  • The core VM servers (AD,DNS,etc) will move to Server 2012
  • Increase security by splitting the domains

Microsoft has a great write-up comparing the old and new virtualization platform: WS 2012 Feature Comparison_Hyper-V

Series NavigationNetwork design >>
This entry was posted in Technotes. Bookmark the permalink.

Leave a Reply

Your email address will not be published. Required fields are marked *

This site uses Akismet to reduce spam. Learn how your comment data is processed.